700-800 tons of limestone gravel production line:
Produce 700-800 tons of limestone crushing plant, stone blasting from the mountains down through the dump truck will be less than 1020mm of stone into the vibrating feeder, vibrating feeder evenly into the stone jaw crusher, jaw crusher machine the first paragraph of the stone crushing out from the broken jaw stone around 150mm-300mm, vibrating feeder material into the European version of the back-breaking second paragraph crushing and sizing screen, Vibrating Feeder of materials points greater than the material of the finished product back to the back-breaking re-broken, finished transportation by belt conveyor to the finished product area.
Note: When the feed is less than or equal to 300mm, the material directly into the European version of the impact crusher broken, not in front of the first paragraph of fragmentation.
Configuration checklist:
Equipment |
Model |
Quantity |
Vibrating Feeder |
GZD1500×6000 |
1 |
Jaw crusher |
PE-1200×1500 |
1 |
Vibrating Feeder |
GZD1300×4900 |
2 |
European Impact Crusher |
PFW1318 |
4 |
Circular Vibrating Screen |
4YZS2460 |
4 |
600-700 tons of granite, basalt gravel production line:
Produce 600-700 tons of granite, basalt, broken equipment, stone blasting from the mountains down through the dump truck will be less than 1020mm of stone into the vibrating feeder, vibrating feeder evenly into the stone jaw crusher, jaw crusher the first paragraph of broken stone, broken jaw broken stone around 150mm - 300mm, vibrating feeder materials into high efficiency hydraulic Cone Crusher for the second paragraph of broken, broken materials afterVibrating screening screening, greater than 40mm of material to return to the cone crusher broken 40mm the following materials by conveyor belt into the shaping machine shaping. Shaping the finished product after Vibrating screening screening by belt conveyors to the finished product area.
Note: When the feed is less than or equal to 320mm, the material directly into the cone crusher broken, not in front of the first paragraph of broken.
Configuration checklist:
Equipment |
Model |
Quantity |
Vibrating Feeder |
GZD1500×6000 |
1 |
Jaw crusher |
PE-1200×1500 |
1 |
Vibrating Feeder |
GZD1300×4900 |
2 |
High efficiency Hydraulic Cone Crusher |
HPC400 |
2 |
Circular Vibrating Screen |
2YZS2460 |
2 |
Shaping machine |
5X1145 |
2 |
Circular Vibrating Screen |
3YZS2160 |
4 |
500-600 tons of limestone gravel production line:
Produce 500-600 tons of limestone crushing plant, stone blasting from the mountains down through the dump truck will be less than 930mm of stone into the vibrating feeder, vibrating feeder evenly into the stone jaw crusher, jaw crusher machine the first paragraph of the stone crushing out from the broken jaw stone around 160mm-275mm, vibrating feeder material into the European version of the back-breaking second paragraph crushing and sizing screen, Vibrating Feeder of materials points greater than the material of the finished product back to the back-breaking re-broken, finished transportation by belt conveyor to the finished product area.
Note: When the feed is less than or equal to 300mm, the material directly into the European version of the impact crusher broken, not in front of the first paragraph of fragmentation.
Configuration checklist:
Equipment |
Model |
Quantity |
Vibrating Feeder |
GZD1300×4900 |
1 |
Jaw crusher |
PEW-1100×1200 |
1 |
Vibrating Feeder |
GZD1100×4200 |
2 |
European Impact Crusher |
PFW1318 |
3 |
Circular Vibrating Screen |
4YZS2460 |
3 |